Case study

Limit level monitoring of gypsum rock
Construction materials industry | ProGap 2.0
Customer: Manufacturer of gypsum (Switzerland)
Product: Gypsum rock
Conveyed mechanism: Free fall after conveyor belt
Installation location: Free fall between conveyor belt and material slide
According to the client, the system offers the following advantages:

  • easy commissioning
  • easy process control, avoidance of plant downtimes
  • avoidance of overflow
Client benefits:

  • timely recognition and signalization of material blockages, thereby prevention of damages