Case study

Lime detection
Energy & Environment | ProSens
Customer: Waste-to-energy facility
Product: Lime / sulfur mixture
Number of measuring points: 2
Installation place: Freefall after screw conveyor
Temperature: 150 °C
What measuring process was used previously: Before the ProSens installation there was no measuring system existing.
Client benefits:

  • If too much lime in the scrubber, gypsum is building up and damage the construction