Case study

Material flow monitoring in the cyclone
Construction materials industry | FlowJam
Customer: Cement plant (Spain)
Product: Raw meal (in the cyclone)
Installation location: with ceramic mounting in the cyclone (high temperature up to 700° C)
According to the client, the FlowJam system offers the following advantages:

  • Continuous material flow monitoring
  • Simple commissioning, problem-free retrofitting
  • With ceramic mounting, usable up to 700 °C
Client benefits:

  • With the ceramic mounting, the measuring system is uncoupled from the heat in the cyclone and supplies a reliable yes/no notification whether material flows or not